Railfan.net Buffalo Central Terminal Image Archive

You are visitor (graphical counter) to Central Terminal 'cterm2005' Photos

Most recently added photos shown first

Click on a thumbnail image to display the full sized photo in a seperate window.

Photos 1 through 25 of 124 total   [Next (26 to 50)]


1/124


Buffalo Central Terminal Photo Days - October 2, 2005
BCT Passenger Concourse with clock, looking west.
Photo by John M. Hague
image/jpeg, 900x598 (24bit)
jmh-bct-04.jpg    108074 bytes

2/124


Buffalo Central Terminal Photo Days - October 2, 2005
Concourse clock looking north.
Photo by John M. Hague
image/jpeg, 605x900 (24bit)
jmh-bct-05.jpg    116228 bytes

3/124


Buffalo Central Terminal Photo Days - October 2, 2005
Blue CTRC sign on southwest entrance.
Photo by John M. Hague
image/jpeg, 900x601 (24bit)
jmh-bct-06.jpg    150070 bytes

4/124


Buffalo Central Terminal Photo Days - October 2, 2005
Tower office space, level 5 (?), typical graffiti & trash.
Photo by John M. Hague
image/jpeg, 900x598 (24bit)
jmh-bct-07.jpg    164312 bytes

5/124


Buffalo Central Terminal Photo Days - October 2, 2005
View from tower southwest showing B&M, USPS and REA buildings.
Photo by John M. Hague
image/jpeg, 600x900 (24bit)
jmh-bct-09.jpg    134753 bytes

6/124


Buffalo Central Terminal Photo Days - October 2, 2005
View from tower southwest showing CSX freight, two loading platforms and USPS.
Photo by John M. Hague
image/jpeg, 900x595 (24bit)
jmh-bct-10.jpg    186173 bytes

7/124


Buffalo Central Terminal Photo Days - October 2, 2005
View from tower southeast showing loading platforms for tracks 13 through 26.
Photo by John M. Hague
image/jpeg, 900x595 (24bit)
jmh-bct-11.jpg    170357 bytes

8/124


Buffalo Central Terminal Photo Days - October 2, 2005
Belt Line looking northeast through the former overpass to the passenger concourse and loading platforms.
Photo by John M. Hague
image/jpeg, 900x599 (24bit)
jmh-bct-12.jpg    169788 bytes

9/124


Buffalo Central Terminal Photo Days - October 2, 2005
Southwest view of the junction (CP 437) between the Belt Line and The Water level Route on which a CSX freight train moves. This area was controlled by Tower 49 in NYC days.
Photo by John M. Hague
image/jpeg, 900x607 (24bit)
jmh-bct-13.jpg    162999 bytes

10/124


Buffalo Central Terminal Photo Days - October 2, 2005
Track 26 loading platform.
Photo by John M. Hague
image/jpeg, 900x598 (24bit)
jmh-bct-14.jpg    143294 bytes

11/124


Buffalo Central Terminal Photo Days - October 2, 2005
Track 25 loading platform.
Photo by John M. Hague
image/jpeg, 900x597 (24bit)
jmh-bct-15.jpg    152090 bytes

12/124


Buffalo Central Terminal Photo Days - October 2, 2005
View north from tracks 25 and 26 toward the tower. The 20th Century Limited used these tracks.
Photo by John M. Hague
image/jpeg, 603x900 (24bit)
jmh-bct-16.jpg    116497 bytes

13/124


Buffalo Central Terminal Photo Days - October 2, 2005
CSX freight with NYC boxcars on the Belt Line in front of the Baggage & Mail building.
Photo by John M. Hague
image/jpeg, 900x596 (24bit)
jmh-bct-17.jpg    163308 bytes

14/124


The new sump pump pit is finally working and we pumped water into a Buffalo sewer line running through Curtiss Street on September 5, 2005.
Photo by Nathan Vester.
image/jpeg, 768x1024 (24bit)
Picture_064.jpg    110505 bytes

15/124


The new sump pump pit is finally working and we pumped water into a Buffalo sewer line running through Curtiss Street on September 5, 2005.
Photo by Nathan Vester.
image/jpeg, 800x600 (24bit)
Picture_070.jpg    83925 bytes

16/124


The new sump pump pit is finally working and we pumped water into a Buffalo sewer line running through Curtiss Street on September 5, 2005.
Photo by Nathan Vester.
image/jpeg, 800x600 (24bit)
Picture_065.jpg    66754 bytes

17/124


The new sump pump pit is finally working and we pumped water into a Buffalo sewer line running through Curtiss Street on September 5, 2005.
Photo by Nathan Vester.
image/jpeg, 800x600 (24bit)
Picture_054.jpg    60794 bytes

18/124


The new sump pump pit is finally working and we pumped water into a Buffalo sewer line running through Curtiss Street on September 5, 2005.
Photo by Nathan Vester.
image/jpeg, 800x600 (24bit)
Picture_056.jpg    53876 bytes

19/124


The new sump pump pit is finally working and we pumped water into a Buffalo sewer line running through Curtiss Street on September 5, 2005.
Photo by Nathan Vester.
image/jpeg, 800x600 (24bit)
Picture_047.jpg    51066 bytes

20/124


Central Terminal on September 4, 2005.
Photo by Nathan Vester.
image/jpeg, 1000x742 (24bit)
Picture_037.jpg    95919 bytes

21/124


We set up a string of lights along the ceiling in the basement for additional light, instead of heading down to the basement with just flashlights every time.
Photo by Nathan Vester taken on September 4, 2005.
image/jpeg, 1000x742 (24bit)
Picture_036.jpg    35079 bytes

22/124


We set up a string of lights along the ceiling in the basement for additional light, instead of heading down to the basement with just flashlights every time.
Photo by Nathan Vester taken on September 4, 2005.
image/jpeg, 1000x742 (24bit)
Picture_035.jpg    39172 bytes

23/124


We set up a string of lights along the ceiling in the basement for additional light, instead of heading down to the basement with just flashlights every time.
Photo by Nathan Vester taken on September 4, 2005.
image/jpeg, 1000x1347 (24bit)
Picture_033.jpg    122479 bytes

24/124


We set up a string of lights along the ceiling in the basement for additional light, instead of heading down to the basement with just flashlights every time.
Photo by Nathan Vester taken on September 4, 2005.
image/jpeg, 1000x742 (24bit)
Picture_034.jpg    29381 bytes

25/124


We set up a string of lights along the ceiling in the basement for additional light, instead of heading down to the basement with just flashlights every time.
Photo by Nathan Vester taken on September 4, 2005.
image/jpeg, 1000x742 (24bit)
Picture_029.jpg    75552 bytes


   [Next (26 to 50)]